Urgent leak or storm damage? Call 01473 974194 - answered day and nightUrgent leak? Call 01473 974194
Ipswich Roofing Specialists
01473 974194 Get a Quote →

Roof Replacements in Martlesham

A roof replacement is a significant job, and understanding what actually happens - from the first inspection to the final clean-up - helps you know whether the work is being done properly.

Urgent leak or storm damage?

Call any time. Calls are answered day and night and passed straight to our roofers.

Call now: 01473 974194
Roof replacements · Martlesham

Expert Roof replacements
in Martlesham

What a full roof replacement actually involves

At Ipswich Roof, we carry out full roof replacements for homeowners in Martlesham and the wider area, including Ipswich, Woodbridge, Kesgrave, Rushmere St Andrew, Westerfield, Claydon, Bramford, Sproughton and Copdock. Every replacement follows the same logical sequence - strip, inspect, prepare, re-roof, finish and clear away. This page explains each stage so you know what to expect and what questions to ask at each point.

Stage 1 - The initial inspection

Before any work is priced or agreed, the roof needs to be looked at properly. A ground-level view or a quick look from a ladder is not enough for a full assessment. A thorough inspection means getting onto the roof to check the condition of the tiles or slates, the flashings, the ridge and hip tiles, the verge and eaves details, and anything visible through the loft hatch from inside.

The loft inspection is particularly important. From inside the roof void you can see the condition of the underlay, whether there is any daylight coming through, and whether there are signs of water tracking in on the timbers - staining, rot or mould. These findings affect the scope of the job and the price. Any roofer who quotes for a replacement without looking inside the loft is working without the full picture.

At this stage you should also discuss access. Most pitched roof replacements require scaffolding, both for safety and to give the team a proper working platform. The scaffolding should be erected before any tiles are removed, not as an afterthought.

Stage 2 - Scaffolding and site preparation

Once the job is agreed, scaffolding goes up around the house. On a standard semi-detached or detached property, a full scaffold allows safe working access at eaves level and means materials can be loaded directly from the scaffold rather than being passed up and down ladders. This matters for efficiency and for the safety of the team and the property below.

Before stripping begins, the team will also put in place protection for the garden, paths and any rooflight openings that might be exposed during the work. The stripping of an old roof produces a significant volume of debris - broken tiles, old felt, battens and any damaged timber - and this needs to be managed from the start, not left to accumulate on the scaffold and around the property.

Stage 3 - Stripping the old roof covering

Stripping is systematic work. Tiles or slates come off first, starting at the ridge and working down towards the eaves. Ridge tiles, hip tiles and any bonded verge details are removed separately. The old battens come off next, followed by the underlay.

As each section is stripped, the exposed timber structure can be assessed. This is the point where the real condition of the roof becomes visible. Sarking boards, rafters and purlins that have been subject to long-term moisture ingress can look sound from below until the covering is off and they can be examined directly. Any that are soft, cracked or rotten need replacing before the new roof goes on. Skipping this step - re-covering over damaged timber - is the most common cause of early failure on a replacement roof.

All the stripped material needs to go somewhere. It should go into a skip or be taken away as part of the job. A site that is allowed to become chaotic during stripping makes the rest of the job harder and is a sign that the team is not working to a clear method.

Stage 4 - Timber repairs and structural checks

Once the structure is exposed, any rotten or damaged timber is cut out and replaced. New timber should be treated - preservative-treated timber resists rot and insect attack significantly better than untreated wood. If a purlin has twisted or sagged, this is the opportunity to correct it before it becomes a problem for the new covering.

If the roof was previously unventilated - as many older roofs were - this is also the point at which ventilation can be introduced. Modern breathable underlays allow a degree of passive ventilation, but on roofs with closed eaves and no ridge ventilation, installing ventilation tiles or ridge ventilation systems at this stage prevents the condensation problems that degraded the old underlay in the first place.

Stage 5 - Fitting new underlay and battens

New underlay goes on before any tile or slate is fitted. On a pitched roof, a breathable membrane is the standard choice - it allows water vapour from inside the building to escape rather than condensing on the cold underside of the membrane. The underlay is lapped correctly at every join and taken down into the eaves so that any water that does get beneath the tiles is directed into the gutter rather than onto the fascia or into the roof void.

New battens are then fixed over the underlay. The spacing of the battens is calculated from the gauge of the tile or slate being used - this is not guesswork, it is determined by the manufacturer's specification for that product. Battens should be treated timber, fixed with the correct-length nails into every rafter, and checked for level as they go on.

Stage 6 - Laying the new tiles or slates

With sound battens in place, the new covering can go on. Tiling or slating starts at the eaves and works upward. At the eaves, a tilting fillet or eaves course is set to give the correct angle for the bottom row. Each course is lapped over the one below by the correct amount - too little lap and the roof will let in driven rain; too much and you use more material than necessary and increase the weight on the structure.

Fixing is critical. The appropriate fixing method - nails, clips or a combination - depends on the tile type and the pitch. On exposed roofs, every tile should be fixed rather than relying on weight alone. Verge tiles, hip tiles and the ridge need particular attention as these are the areas most vulnerable to wind lift.

Lead flashings around chimneys, roof lights, abutment walls and soil pipes are dressed in at this stage. Flashing is not a job to rush - poorly dressed lead is one of the most common sources of water ingress on an otherwise sound roof.

Stage 7 - Ridge, hips and finishing details

The ridge is the highest point and the last section to be completed on a pitched roof. Ridge tiles can be bedded in mortar or, on modern roofs, mechanically fixed using a dry ridge system. Dry ridge systems are increasingly the preferred choice - they do not rely on mortar, which can crack and lift over time, and they include ventilation as standard.

Hip tiles, bonnet tiles and any decorative ridge finials are fitted and checked for alignment. The verge edges are finished - again, a dry verge system is now common and avoids the cracking that mortar verges are prone to.

Gutters are checked and, if necessary, re-fixed or replaced at this stage. The new roof will not perform properly if the water coming off it cannot drain away freely.

Stage 8 - Inspection and clean-up

Once the covering is complete, the whole roof should be walked over and inspected before the scaffold comes down. This is the time to check that every tile is seated correctly, every flashing is dressed properly, every ridge tile is secure and all valleys are clear. It is much easier to correct anything at this stage than after the scaffold is gone.

The final stage is clearing the site. All debris, offcuts and packaging should be removed. The scaffold comes down and the gutters are cleared of any tile dust or grit that collected during the work. A well-run replacement job leaves the property tidy.

If you are planning a roof replacement in Martlesham or a nearby village, call us for a roof survey and we will talk you through what the job involves for your specific property before any commitment is made.

Why choose Ipswich Roof?

  • Free survey and itemised quote
  • Fixed price - no surprises
  • Local team

Get your free quote

No obligation · We'll call you to arrange a free visit

By submitting you agree to being contacted about your enquiry. No spam, ever.

Urgent leak or storm damage?

Call any time. Calls are answered day and night and passed straight to our roofers.

Call now: 01473 974194