New Roofs in Martlesham

If you're planning a new roof in Martlesham, understanding exactly what the job involves - from the initial survey through to the final tidy-up - helps you know what to expect and what questions to ask.

Urgent leak or storm damage?

Call any time. Calls are answered day and night and passed straight to our roofers.

Call now: 01473 974194
New roofs · Martlesham

Expert New roofs
in Martlesham

A new roof from start to finish

A full roof replacement is a substantial piece of work that takes place in a logical sequence. Each stage has a purpose, and understanding why things happen in the order they do helps you assess whether the work is being done properly. Below is how a new pitched roof installation progresses on a typical domestic property.

Stage 1 - The initial survey

Before any price is given or material ordered, the existing roof needs to be assessed properly - not just from the ground or a quick glance through the loft hatch. A proper survey involves getting to roof level, checking the condition of the current covering, inspecting the timbers from inside the loft, and looking at the details: valleys, hips, ridges, flashings, gutters and fascias.

The survey establishes whether the timber structure is sound enough to carry a new covering, whether any rafters or purlins have softened or cracked, and whether the existing fascia and soffit boards need replacing at the same time. Finding a rotten rafter after the old tiles are already off adds time and cost to the job. A thorough survey upfront avoids surprises.

This is also the stage at which planning considerations are checked. If the property is in a conservation area, or if the proposed material is different from the existing covering, permitted development rights may not apply and a planning application could be needed. Better to establish this before ordering materials.

Stage 2 - Scaffolding and access

Safe access scaffolding is erected before any roofing work begins. The scaffold needs to be adequate - not just a tower at one end of the building - and should provide a full perimeter platform from which materials can be distributed, old tiles removed and new tiles loaded. On a large or complex roof this makes a significant difference to both the quality of the work and the safety of everyone on site.

Scaffold also protects the property below. Properly boarded platforms catch debris and protect windows, gutters and the garden below. Ask specifically about how waste will be managed and whether a skip will be positioned on the scaffold platform or on the ground.

Stage 3 - Strip-out

The old tiles or slates come off first, followed by the battens and the underlay. This is when the timber structure is fully visible and any problems that weren't apparent during the survey can be confirmed or ruled out. Ridge tiles, hip tiles, valley liners and any existing flashings are all removed at this stage.

If timbers need repair or sistering (where a new rafter is fixed alongside a damaged one), this is done now before any new material goes on. A new roof laid over a failing structure will simply fail again. Any repairs to fascia boards, soffit boards and barge boards are also carried out at this stage, since they are easier to access and can be integrated with the new guttering run.

Old materials are loaded into a skip or bagged for removal. The weight of concrete and clay tiles is considerable - a full roof strip on a typical semi-detached house can generate several tonnes of waste - so waste disposal logistics are planned before work starts.

Stage 4 - New underlay and battens

Modern breathable underlay is draped over the rafters before battening begins. Unlike older bitumen felt, breathable underlay allows moisture vapour to escape from the loft while still providing a secondary line of defence against wind-driven rain. It is fixed with stainless steel fixings and lapped correctly at joints and at the eaves to prevent water tracking back under the tiles.

Counterbattens (battens running down the slope) are fixed over the underlay first on some specifications to create a ventilation gap behind the tile battens. The horizontal tile battens are then fixed at the correct gauge for the specific tile being used. Getting the gauge right is critical - the wrong batten spacing means tiles won't overlap correctly and the roof will fail its weathertightness.

Stage 5 - Tiling or slating

Tiles are loaded onto the scaffold platform and distributed across the roof before laying begins. Starting from the eaves and working upward, each course is fixed with the correct nail or clip specification for the tile and the roof pitch. On exposed sites or steeper pitches, every tile may need to be mechanically fixed; on shallower pitches in sheltered locations, fixing patterns can be lighter - but this must be calculated correctly, not guessed.

Hip and valley junctions require particular care. A cut hip requires each tile to be cut and fixed individually; a valley can be handled with a lead-lined open valley, a dry valley system, or cut and mitred tiles depending on the specification. Valleys are one of the most common points of water entry on a poorly executed roof, so the detail here matters.

Ridge tiles are the last pitched element to go on, bedded in mortar or fixed with a dry-fix system. Dry-fix ridge systems have become standard on new roofs because mortar ridges can crack and loosen within a few years, whereas dry-fix mechanical fixings are more reliable in the long term.

Stage 6 - Flashings and leadwork

Lead flashings around chimneys, dormers, skylights and where the roof meets a wall are cut, dressed and fixed after the main tile covering is complete. Lead is the most durable flashing material for domestic roofs; correctly specified and installed lead flashings can last 60 years or more. The lead is fixed to the wall with lead wedges driven into raked-out joints and pointed over with mortar, or secured with clips on modern masonry.

Chimney stacks require a back gutter (a lead-lined channel behind the stack that carries water away), side flashings and a front apron. Each piece is dressed individually to the profile of the tiles. This is skilled, time-consuming work - a chimney that leaks after a re-roof is almost always down to inadequate leadwork rather than tile failure.

Stage 7 - Guttering and drainage

New fascia boards and guttering are usually fitted as part of a full re-roof. Gutters must be fixed at the correct fall - typically around 1:350 - to ensure water drains to the outlet rather than sitting and overflowing. Oversized gutters and downpipes are worth specifying on large roof areas, particularly where there are valleys concentrating water flow.

Gutter joints and outlets are the most common cause of soffit and fascia damage. Well-fitted guttering with sealed joints protects the new fascia boards and prevents water from tracking back into the roof void at the eaves.

Stage 8 - Final inspection and clean-up

Once all the roofing, flashings and guttering are complete, the scaffold gives a final opportunity for a full visual inspection from close range. Ridge and hip alignment, flashing dressing, mortar pointing if used, and tile coursing are all checked before the scaffold comes down.

Scaffold is then struck and removed. The site is cleared of all debris, broken tiles, offcuts and packaging. Gutters are checked and cleared of any tile dust or debris before the downpipes are reconnected.

We install new roofs in Martlesham and across the Ipswich area. If your roof needs replacing and you want a clear picture of what the job involves before committing, call us to arrange a survey at roof level.

Why choose Ipswich Roof?

  • Free survey and itemised quote
  • Fixed price - no surprises
  • Local team

Get your free quote

No obligation · We'll call you to arrange a free visit

By submitting you agree to being contacted about your enquiry. No spam, ever.

Urgent leak or storm damage?

Call any time. Calls are answered day and night and passed straight to our roofers.

Call now: 01473 974194