New roofs in Harwich

Understanding exactly what happens during a new roof installation helps you know what to expect and what questions to ask at every stage.

Urgent leak or storm damage?

Call any time. Calls are answered day and night and passed straight to our roofers.

Call now: 01473 974194
New roofs · Harwich

Expert New roofs
in Harwich

A new roof from start to finish

A new roof installation is not a single task - it is a sequence of stages, each of which affects the quality of what comes next. Knowing what that sequence looks like puts you in a much stronger position as a customer, whether you are comparing contractors, managing the disruption at home, or checking that the job has been done properly at the end.

We install complete new roofing systems for properties in and around Harwich, covering pitched tile and slate roofs, flat roofing systems and metal roofing. Here is how a typical full re-roof or new roof installation unfolds.

Stage one: survey and specification

Everything begins with a proper survey. A contractor who quotes from the ground or from photographs is guessing, and the guess is usually optimistic. A thorough survey means getting into the loft to check the condition of rafters, purlins, the ridge board and any other structural timbers, as well as assessing the existing covering from the outside.

The survey establishes what is being replaced, what needs structural repair before new materials go on, what system is appropriate for the pitch and shape of the roof, and what the access requirements are. For pitched roofs, the pitch angle determines which tile profiles can be used - a low-pitch slope that was previously tiled with interlocking concrete tiles may not be appropriate for natural slate without adjustment. These are decisions that need to be made before materials are ordered, not after stripping has started.

If rooflights or structural alterations - changing a ridge height, altering a valley configuration, forming a new opening - are part of the project, these need to be designed into the specification at this stage. Making changes mid-job is expensive and disruptive.

Stage two: access and setting up

Safe access is not optional. Working at height requires appropriate scaffolding or a scaffold tower, and the access structure needs to be adequate for the weight and volume of materials being moved. On a full re-roof this means a lot of material coming down and a lot going back up - loading scaffold bays need to be properly positioned to make this practical and safe.

Temporary protection for windows, doors and any vulnerable surfaces below the working area is set up before stripping begins. A skip or large bags are positioned for waste. If the property has a rear garden or limited access, this logistics stage is worth discussing with the contractor in advance.

Stage three: stripping the existing roof

The existing covering is stripped back to the deck or rafters. On a pitched roof this means removing tiles or slates, taking up the old roofing felt and battens, and clearing all debris. Old mortar from ridge tiles and any failed flashing is removed at this stage.

Once the structure is exposed, the actual condition of the timbers becomes clear. Any rotten or damaged rafters, sections of ridge board, or failing purlins are identified and marked. This is the stage at which the specification may need to be adjusted - if a survey found suspect timbers, stripping confirms how much needs replacing. A reputable contractor will show you what they have found and explain what needs doing before continuing.

On flat roofs, stripping means removing the existing membrane and any failed insulation down to the deck. If the deck boards themselves are rotten or deflecting, these are replaced before the new system goes down.

Stage four: timber repairs and deck preparation

Any rotten or structurally compromised timber is cut out and replaced with treated timber of matching section. This is not cosmetic - a new roof covering on failed timbers will not perform correctly and may develop problems within a few years. Where a whole rafter or section of purlin is being replaced, the new timber is properly scarfed and fixed to the existing structure.

If additional ventilation is required - and on many older properties it is, to meet current standards and prevent condensation buildup - this is installed at this stage. Counter-battens that allow air movement beneath the membrane may be part of the specification.

Stage five: membrane and battens

On a pitched roof, breathable roofing membrane is laid over the rafters from eaves to ridge, lapped correctly at the joins and dressed into the gutters at the bottom edge. Breathable membrane has largely replaced traditional bitumen felt on new installations because it allows moisture vapour to escape from the roof structure while remaining waterproof from outside. This reduces the risk of condensation-related timber decay.

Battens are then fixed through the membrane into the rafters at the correct gauge for the tile or slate being used. Batten gauge - the distance between each batten - is calculated from the tile manufacturer's specification and the pitch of the roof. Getting this wrong results in tiles that do not sit correctly and a roof that leaks.

On a flat roof, insulation is laid to the required specification before the waterproofing system goes down. The substrate needs to be clean, dry and firm. EPDM is bonded in large sheets to minimise seams.

Stage six: fixing tiles, slates or metal

Tiles and slates are fixed from eaves to ridge. Each course is checked for line and level as it goes up. On a plain tile roof, every tile is nailed; on a concrete interlocking tile roof, tiles are nailed at intervals according to specification and wind zone. Slates are individually centre-nailed or head-nailed with copper or stainless steel nails - fixings that will not corrode and fail over the life of the roof.

Hips and valleys are formed as the tiling progresses. Valleys can be open (lined with lead) or closed (using purpose-made valley tiles). The choice affects both appearance and drainage performance. Lead soakers and step flashings are cut and dressed around chimney stacks and any abutments with walls at this stage, formed to the correct dimensions and properly dressed into the joints.

The ridge is the last section of the main covering to be installed. On new roofs, dry-fix ridge systems - which use mechanically fixed ridge caps and ventilated components rather than mortar - are the standard approach. Dry-fix ridges are more durable and do not suffer from the mortar cracking that affects traditionally pointed ridges.

Stage seven: gutters and ancillaries

Once the main covering is complete, guttering is checked and rehung if needed. Fascia and soffit boards are inspected; any that have deteriorated are replaced before the new guttering goes up. Downpipes are checked for secure fixing and clear flow. If the project included rooflights, these are installed and flashed at this stage.

Stage eight: clean-up and check

A proper roof installation finishes with a thorough clean of the working area - all broken tile, mortar debris, cut material and packaging is removed. The finished roof is checked from the scaffolding before it comes down, looking at ridge alignment, flashing details, valley formation and the condition of all lead work.

If you are in Harwich and want to discuss a new roof, call us to arrange a survey. We will work through every stage of the specification with you before any work begins.

Why choose Ipswich Roof?

  • Free survey and itemised quote
  • Fixed price - no surprises
  • Local team

Get your free quote

No obligation · We'll call you to arrange a free visit

By submitting you agree to being contacted about your enquiry. No spam, ever.

Urgent leak or storm damage?

Call any time. Calls are answered day and night and passed straight to our roofers.

Call now: 01473 974194