Flat roofing in Martlesham - what happens from first inspection to clean-up

If you want to know exactly what a flat roofing job involves from the moment we arrive to the moment we leave your property in Martlesham, this page walks through the whole process.

Urgent leak or storm damage?

Call any time. Calls are answered day and night and passed straight to our roofers.

Call now: 01473 974194
Flat roofing · Martlesham

Expert Flat roofing
in Martlesham

Why the process matters as much as the materials

Most homeowners comparing flat roofing quotes focus on price and the name of the system. What actually determines whether a flat roof lasts its full expected life is the quality of every step in the installation - preparation, detailing and drainage in particular. A premium membrane laid badly over a damp deck on a roof with inadequate falls will fail years before its time. Understanding what should happen at each stage helps you judge whether a roofer is cutting corners.

We install and replace EPDM rubber, single-ply membrane and felt flat roofs on extensions, garages and outbuildings across Martlesham and the surrounding area, covering Ipswich, Woodbridge, Felixstowe, Stowmarket, Hadleigh and Freston.

Stage 1: the initial roof survey

Before any price is given, the roof needs to be looked at properly - from roof level, not just from the ground. A visual inspection from below can miss blistering, pooled water residue, split upstands, failed flashings and soft areas in the deck. Getting up and walking the roof surface tells a very different story.

At the survey stage, a roofer should be checking: the condition of the existing covering; the falls across the roof and whether water is draining correctly; the state of the deck beneath (pressing on the surface to identify soft spots); the condition of all upstands, abutments and any pipe or vent penetrations; and the outlet or gutter arrangement. If the survey is done properly, there should be few surprises once stripping starts.

Stage 2: stripping the old covering

On a replacement job, the first task is removing the existing covering back to the deck. This means taking off all the old felt, membrane or mineral-finish sheets and disposing of them. On older properties, built-up felt can be several layers thick where previous coverings were laid over rather than stripped - some roofs carry three or four generations of felt. These layers add weight and trap moisture, which is one reason the practice of laying over existing felt is poor practice on any roof that is to perform well.

Once the old covering is off, the deck is exposed and can be properly assessed. Timber decks - most commonly 18 mm or 22 mm WPB plywood - should be checked for rot, delamination and secure fixing. Any boards that are soft, stained through or lifting at the joints need replacing before the new system goes on. Cutting corners here by covering a damaged deck is the most common cause of premature flat roof failure.

Stage 3: deck repair and preparation

Deck repairs are priced separately in most cases because the extent of damage is not visible until the old covering is stripped. Any roofer who gives you a fixed total price that includes deck repair before they have seen the deck is guessing. Legitimate quotes will state a day rate or a per-board rate for any additional deck work needed.

Once repairs are complete, the deck needs to be clean, dry and secure. For warm roof build-ups - where the insulation sits above the structural deck - the deck surface is prepared to receive the vapour control layer. For cold roof builds on garages and non-habitable spaces, the approach differs but the requirement for a clean, sound deck is the same.

Stage 4: insulation and vapour control layer

On habitable spaces - an extension with a living room or bedroom below - current building regulations require the replacement roof to achieve minimum thermal performance. This normally means installing rigid insulation boards above the deck as part of a warm roof build-up. The insulation sits on a vapour control layer (VCL), which is a low-permeability sheet taped and lapped at all joints to prevent warm, moisture-laden air from the room below migrating into the insulation where it would condense.

The insulation layer also affects the finished falls on the roof. Tapered insulation - boards cut or manufactured at a slight angle - can be used to create or improve falls where the deck structure itself does not provide enough pitch. This is a more expensive solution than correct falls at the structural level, but it is sometimes the only option on an existing building without major structural alteration.

Stage 5: installing the new flat roof covering

The membrane or covering goes on once the deck and insulation are sound and dry. The installation method depends on the system.

  • Torch-on felt: the base sheet is mechanically fixed to the deck, then the cap sheet is heat-welded using a roofing torch, lapping joints by at least 75 mm and fully bonding at all edges and upstands. Correct flame temperature and speed of travel across the surface are both critical to a sound weld.
  • EPDM rubber: the membrane is cut to size allowing generous lap margins, then contact adhesive is applied to both the deck and the membrane in sections. The membrane is rolled out and pressed firmly into the adhesive, taking care to eliminate air pockets. Edge trims and upstand adhesive tape are applied to complete the weather seal.
  • Single-ply membrane: the membrane is mechanically fixed at the perimeter and laps, with joints hot-air welded using a specialist welder to create a continuous homogeneous seam. Penetrations are formed with purpose-made boots or fabricated collars welded in.

In all three systems, the quality of detailing at upstands - where the covering turns up against a wall - is where most failures occur. The membrane must be taken a minimum of 150 mm up the wall, terminated in a proper chase or under a cover flashing, and sealed at the top edge. A covering that simply laps onto the wall surface with a line of sealant will not last.

Stage 6: lead and metal flashings

Where the flat roof abuts a house wall or parapet, lead or aluminium flashings should be dressed into a chase cut into the mortar joint and fixed with lead wedges or proprietary clips, then pointed up with suitable mortar or sealant. The flashing covers the top of the upstand and prevents water tracking behind it. Skimping on flashings - using only sealant without a proper mechanical fix into the wall - is a common shortcut that fails within a few years as the sealant cracks.

Stage 7: outlets, drainage and edge trims

Every flat roof needs a reliable path for rainwater to leave. Outlets, downpipes and gutters should be checked and cleared before the new roof goes on, and the membrane should be correctly formed and bonded around each outlet so there is no gap at the most water-stressed point on the roof surface. Edge trims - aluminium or lead drip edges - are fixed at the perimeter to carry water clear of the fascia and prevent it from running back under the covering.

Stage 8: inspection and clean-up

Once the installation is complete, the roof should be walked again to check all seams, upstands, flashings and outlet formations before the scaffolding or access equipment comes down. Any material or debris from the job should be cleared from the property, and gutters and outlets should be free of swarf, adhesive offcuts and packaging.

Ask the roofer to walk you through what they have done before they leave, particularly the detailing at upstands and any areas where the deck needed repair. Knowing what was found and what was done is useful information to have if you ever sell the property or need to make an insurance claim.

Flat roofing across Martlesham and beyond

We work across Martlesham, Ipswich and the surrounding area, covering Woodbridge, Felixstowe, Stowmarket, Hadleigh and Freston. If you are planning a flat roof replacement or repair, call us to arrange a survey - we will look at the roof properly and talk you through exactly what needs doing before we quote.

Why choose Ipswich Roof?

  • Free survey and itemised quote
  • Fixed price - no surprises
  • Local team

Get your free quote

No obligation · We'll call you to arrange a free visit

By submitting you agree to being contacted about your enquiry. No spam, ever.

Urgent leak or storm damage?

Call any time. Calls are answered day and night and passed straight to our roofers.

Call now: 01473 974194