Exterior cladding in Martlesham

If you are planning exterior cladding for your Martlesham home, here is exactly what the job involves from the moment we arrive to the moment we pack up.

Urgent leak or storm damage?

Call any time. Calls are answered day and night and passed straight to our roofers.

Call now: 01473 974194
Exterior cladding · Martlesham

Expert Exterior cladding
in Martlesham

Why knowing the process helps you plan properly

Exterior cladding is a bigger job than most homeowners expect the first time they look into it. It is not simply fixing boards to a wall - it involves assessing the existing surface, building a new framework, handling all the tricky details around windows and corners, and leaving the elevation properly sealed against weather. Understanding the stages helps you set realistic expectations for time, access and disruption.

What follows is a straightforward account of how a cladding installation is carried out, from initial inspection through to clearing up at the end.

Stage 1: The initial survey

Before any material is ordered, the existing walls need to be properly assessed. This means checking the surface - render, brick, pebbledash or whatever is currently there - for hollow spots, active cracks, areas of loose material and any signs of moisture ingress. Tapping render with a knuckle reveals hollow sections where it has separated from the wall behind. These need to come off before cladding goes on, otherwise the new boards are fixed to something that is about to fall away.

The survey also identifies any external issues that need sorting first: leaking gutters, damaged downpipes, cracked window sills or failed flashings. Cladding fitted over these problems will conceal them, not fix them, and the hidden damage will continue. Any contractor worth hiring will flag these at the survey stage and discuss what needs addressing before the cladding work begins.

Measurements are taken at the same time - the total area to be clad, the number of window and door openings, the height of the elevation and the number of corners. These feed directly into the material order and the price.

Stage 2: Preparation of the existing wall

Once the survey findings are clear, preparation work begins. Loose or hollow render is hacked off and the surface underneath checked. If there is active damp, the source needs to be found and dealt with - whether that is a failed damp-proof course, a bridged cavity or a leaking overflow pipe.

On brick elevations, open mortar joints are raked out and repointed where necessary. The goal is a stable, sound surface for the batten system to be fixed into. This stage can take anything from a few hours on a straightforward wall to a full day on an elevation with significant render failure.

Stage 3: Installing the batten framework

The batten system is the hidden part of any good cladding installation and the part that is most often cut corners on. Treated timber or metal battens are fixed horizontally to the wall at set centres - the spacing depends on the board type and the manufacturer's specification. Getting this wrong either means the boards are not supported properly and flex when pushed, or the fixing points do not line up with the board edges and the fixings are in the wrong place.

A vertical batten is often fixed first, followed by horizontal battens. This creates a ventilated cavity - typically 25mm to 40mm - between the old wall and the back of the new boards. This gap allows air to circulate and any moisture that gets in to drain out at the bottom rather than sitting trapped behind the cladding.

At the base of the wall, a starter track or J-trim is fitted level. This is the reference point that every board above it follows, so getting it dead level across the full width of the elevation is critical. If this goes on crooked, every board above will be crooked too.

Stage 4: Fitting the cladding boards

For uPVC boards, the first board clicks or slots onto the starter trim and is then nailed or screwed to the battens at each crossing point. Fixings go through slots rather than round holes on most profiles, which allows the board to move slightly as it expands and contracts with temperature change - this prevents the boards buckling or pulling the fixings in warm weather.

Fibre cement boards are fixed differently: face-fixed with nails or screws into the battens, with fixings positioned per the manufacturer's guide. Cut edges are primed on site before fitting to prevent moisture absorption at the exposed cement.

Each board overlaps the one below it. The amount of overlap - called the exposure - is specified for each board profile and should be consistent throughout the job. Inconsistent exposure is visible from the street and is a sign the job was done without care.

Working around windows and doors is the most time-consuming part. Window and door reveals need to be trimmed with purpose-made J-channel or casing trim so that the board ends are protected and the junction between the cladding and the frame is weathertight. On older properties with deep reveals, this can be fiddly work.

Stage 5: Corners, edges and penetrations

External corners are finished with purpose-made corner trim rather than mitred boards. Mitred corners on cladding are a weak point for water ingress and tend to open up over time as the material moves. Corner trim caps both board ends and keeps the joint tight regardless of thermal movement.

Any pipe, cable or overflow outlet that passes through the cladding needs a proper collar or flashing fitted around it. Sealant alone around a round penetration will crack as the cladding moves and as the sealant ages. A correctly fitted collar keeps the board end away from the penetration and creates a durable seal.

The top of the cladding, where it meets the soffit or the underside of the eaves, needs a top trim or flashing to close off the cavity. Leaving this open allows birds and insects to enter the cavity and can allow wind-driven rain to penetrate horizontally.

Stage 6: Soffits and fascias (where included)

Many cladding jobs also include replacing the soffits and fascias at the same time. Doing both together makes sense practically - the scaffold or working platform is already in place, and the finished elevation looks complete rather than having new walls under old, stained timber. uPVC soffit boards are available in vented or solid panels; vented panels allow roof space ventilation and are the correct choice in most circumstances.

Stage 7: Final check and clean-up

Once the boards are all on and the trims are fitted, the elevation is checked systematically: every corner, every window junction, every penetration and the top and bottom edges. Any gaps in the sealant are addressed, and fixings that have not pulled flush are tapped home.

Off-cuts and packaging are cleared from the site, and any splashes of primer or sealant on windows and sills are cleaned off before they cure. The job is not done until the site is tidy.

How long does a cladding job take?

Properties with many windows, bay windows or unusual features take longer than simple flat elevations.

If you are planning exterior cladding for your home in Martlesham or the wider Ipswich area, call us for a roof and wall survey. We will walk you through what we find, explain what preparation the walls need and give you a clear price for the work.

Why choose Ipswich Roof?

  • Free survey and itemised quote
  • Fixed price - no surprises
  • Local team

Get your free quote

No obligation · We'll call you to arrange a free visit

By submitting you agree to being contacted about your enquiry. No spam, ever.

Urgent leak or storm damage?

Call any time. Calls are answered day and night and passed straight to our roofers.

Call now: 01473 974194