If you are commissioning commercial roofing work in Martlesham for the first time, knowing what a properly run job looks like from start to finish helps you judge whether the contractor in front of you knows what they are doing.
Call any time. Calls are answered day and night and passed straight to our roofers.
Commercial roofing is not a simple swap of materials. A well-run project follows a clear sequence: survey, specification, access planning, strip and preparation, installation, drainage check, and clean-up. Each stage affects the next. Cutting corners at the survey stage usually means problems discovered mid-job, and problems discovered mid-job cost more to resolve.
Below is an honest account of what each stage involves and what you should expect to see at each point.
Before any price can be given, the roof needs to be seen properly. A survey on a commercial building means getting onto the roof, not just looking up from the car park. The surveyor should walk the whole surface, check the deck for soft spots or deflection, probe any suspect areas of membrane, inspect all flashings and upstands, and look at the outlets and gutters.
On larger roofs, a survey may involve core sampling - cutting a small plug through the membrane and insulation to check whether water has reached the deck and whether the insulation is saturated. Saturated insulation adds weight and loses its thermal performance; it cannot simply be left in place and covered over.
The output of the survey should be a clear picture of what is there, what its condition is and what the options are. At this point you should be able to understand whether a repair, a re-cover or a full strip-back replacement is appropriate. A price given without a proper survey is a guess.
Once the survey is done and the scope of work is agreed, the contractor should produce a specification - the list of exactly what materials will be used, in what order, to what detail. For commercial buildings, this is important because buildings have warranties, leases and insurance requirements that may specify minimum standards.
Access planning matters more on commercial sites than domestic ones. Scaffolding, MEWP (mobile elevated work platform) hire, cherry-picker access, or edge protection all need to be arranged before work starts. On a building that is occupied during the works, the plan also needs to cover how the roof will be kept weathertight overnight or between sessions, and how noise or disruption will be managed during business hours.
For larger or more complex commercial sites, it is worth asking the contractor for a brief method statement - a written outline of how they intend to carry out the work safely. This is standard practice on any properly managed commercial project.
Where a full replacement is needed, the existing membrane, insulation and sometimes the deck itself must come off. On a built-up felt roof, this means cutting and removing multiple bonded layers - heavy work that produces a significant volume of waste. Commercial roofing waste must be disposed of correctly, and it is reasonable to ask the contractor how waste will be managed and taken off site.
Once the old material is off, the deck is inspected in detail. Timber decks are checked for rot and replaced where needed. Metal decks are checked for corrosion and deflection. Any damaged sections must be made good before the new system goes on - the new membrane is only as good as what it sits on.
Where a re-cover is appropriate (laying new material over sound existing material), the surface is prepared by cleaning, drying and priming as required by the new system being installed. Not all surfaces are suitable for re-covering; the contractor should be able to explain why the approach they are recommending is correct for your specific roof.
Installation varies by material. Built-up felt is torched or cold-applied in layers, with each layer bonded fully and laps properly dressed. EPDM is unrolled, bonded or mechanically fixed, and seams are carefully joined with approved adhesive. Single-ply membranes are hot-air welded at seams, with welds probed by hand or checked with a test probe after cooling. Metal standing seam panels are fixed with clips that allow thermal movement, not screws through the face.
Flashings are installed as the membrane work progresses, not added as an afterthought at the end. At upstands, parapet walls, rooflights, pipe penetrations and any other interruption in the membrane, the flashing detail is critical. Water finds every junction and every point where two materials meet. A well-detailed flashing takes time to do correctly and should be visible to you as an indicator of quality.
Falls - the slope built into the roof surface to ensure water drains to the outlets - are checked during installation. On a flat commercial roof, a minimum fall of 1:80 is the standard reference point, though 1:40 is preferable in practice. If falls are being formed as part of the new system (using tapered insulation, for example), they should be verified before the membrane goes over them.
Once the membrane is down, every outlet and gutter connection is checked. Outlets must be clear, properly set into the membrane without gaps, and connected to the drainage below. Gutters on commercial buildings are often in poor condition by the time a roof replacement is commissioned - replacing or lining the gutters at the same time as the roof avoids a return visit within a few years. Fascias and soffits are inspected and replaced where they have rotted or corroded.
A simple water test - running water across the roof surface and watching how it travels to the outlets - is a basic check that any contractor should carry out before calling the job done. It takes a few minutes and confirms the falls work as designed.
A commercial site should be left clean and safe at the end of each working day, not just at the end of the contract. Debris, off-cuts and waste from a commercial roofing job accumulate quickly and create trip hazards and fire risk if left on site.
At handover, you should receive confirmation of what was installed, including the membrane type, insulation specification and flashing materials. If any manufacturer technical documentation applies to the system, you should be given copies. Keep this paperwork - it matters if you sell the building or if an insurance claim ever involves the roof.
We carry out commercial roofing across Ipswich and the surrounding area, including Martlesham and nearby locations. Whether you are managing an office building, a warehouse, a retail unit or an industrial site, call us to arrange a proper survey and a clear account of what the work will involve.
No obligation · We'll call you to arrange a free visit
Call any time. Calls are answered day and night and passed straight to our roofers.