A commercial roofing project involves more steps than most building owners expect, and understanding the process helps you ask the right questions, plan for any disruption and judge whether a contractor is working to a proper standard. Here is what a well-run job looks like from start to finish.
Before any price is given or material is specified, the roof needs to be inspected properly. For a commercial building, that means accessing the roof surface directly - not looking at it from ground level or from a photograph. We check the condition of the existing covering, the deck beneath it, the drainage outlets and box gutters, the flashings at parapets and penetrations, and any rooflights or roof-mounted equipment.
The deck inspection matters particularly. A flat roof deck on a commercial building may be concrete, metal decking, timber boarding or a composite panel. Its condition determines what systems can be laid over it and whether any section needs replacing before the new covering goes on. A membrane laid over a soft, delaminated or damp deck will not perform as it should, regardless of the quality of the membrane itself.
On buildings in Harwich where a roof has been repaired multiple times, there may be layers of old felt or membrane to assess. In some cases, these can remain in place under a new covering. In others, they need to come off to allow a proper inspection of the deck and to avoid adding unnecessary weight or trapping moisture.
Once the inspection is complete, the scope of work can be defined accurately. This covers: which areas need full replacement versus localised repair, what membrane or covering system is appropriate for this building and use, what insulation level is achievable and practical, how drainage will be addressed, and what access equipment is needed for the site.
On a commercial site the access question is important. Scaffolding, mobile elevated work platforms (MEWPs) and edge protection are all standard requirements depending on building height and roof configuration. The access method affects both cost and programme, and it needs to be factored in from the start rather than decided on the day. A responsible contractor will confirm the access approach before work begins.
Where old material is being removed, stripping is the first physical stage. On a large warehouse or industrial roof this generates significant arisings - waste felt, old insulation boards, chippings - that need to be managed and disposed of correctly. Stripped-back roof sections are typically covered with a temporary waterproof layer at the end of each working day, so the building interior is not left open to rain overnight.
With the old covering off, the deck can be inspected in full. Any areas of rot in a timber deck, corrosion in a metal deck, or cracked or hollow sections in a concrete deck are identified at this point and repaired or replaced before the new build-up begins. This is also when any existing insulation that has become saturated is removed.
On a flat roof this typically means laying a vapour control layer directly onto the deck, then insulation boards, then the membrane system. The vapour control layer prevents warm, moist air from inside the building migrating into the insulation and condensing - a common cause of long-term performance problems on commercial roofs.
Insulation boards are laid tightly butted to minimise cold bridging. Tapered insulation - boards cut to a slight angle - can be used to create or improve the falls on a roof that does not drain adequately with the existing structure. This is particularly useful on older commercial roofs designed before current drainage guidance was in place.
The membrane is then installed according to the system specification. Single-ply membranes are either mechanically fixed through the insulation into the deck and then covered at fixings with the membrane, or fully adhered with compatible adhesive. Seams are hot-air welded and tested. Built-up felt is applied in layers with each course bonded fully to the one below. Metal sheet roofs are fixed to purlins with the correct fastener pattern and sealing washers torqued to the manufacturer's specification.
Flashings are the details that most often fail on commercial roofs and they deserve as much care as the main field of the roof. At parapet walls, the membrane is dressed up the upstand and covered with a separate flashing - lead, code-specified aluminium, or a compatible membrane flashing strip - that is lapped and bonded correctly. At rooflights, the kerb is dressed and the rooflight frame is set with adequate upstand height above the finished roof level. At pipe penetrations and conduit runs, purpose-made collars or pitch pockets are used and sealed.
A common problem on commercial buildings is that rooflights and penetrations were installed with inadequate upstand height - sometimes as little as 50mm above the finished roof level. At that height, any ponding or debris build-up reaches the seal. Where possible, upstand heights should meet current guidance of at least 150mm above the finished roof surface.
Before the site is cleared, all drainage outlets, box gutters and downpipes are checked and cleared. New outlets are sealed into the membrane correctly with purpose-made bonding flanges rather than just cutting the membrane around an existing outlet and relying on sealant. Falls to outlets are checked to confirm water will run clear rather than pond.
A commercial roofing site should be left clean at the end of the job. Waste from the strip-out is removed and disposed of properly. Any debris from the working area around the building is cleared. The finished roof is visually inspected before the access equipment is removed.
If you are planning commercial roofing work on a building in Harwich, call us to arrange an inspection. We will set out what the job involves for your specific building and give you a clear account of the work before anything is agreed.
No obligation · We'll call you to arrange a free visit
Call any time. Calls are answered day and night and passed straight to our roofers.