If you have been wondering what a chimney take-down actually involves from start to finish, this page walks through each stage of the job as we carry it out in Martlesham and across the surrounding area.
Call any time. Calls are answered day and night and passed straight to our roofers.
Before any work is planned or priced, the chimney stack needs to be properly looked at. A glance from the garden tells you very little. What matters is the condition of the pointing between the bricks, the state of the flaunching at the top, the lead flashing at the roof base, and whether the stack has moved at all relative to the roof slope.
A proper inspection means getting eyes on the stack from close range, which requires either a ladder or, for taller or more complex roofs, a scaffold platform. We check the brickwork for horizontal cracking, erosion of mortar joints, any spalling of the brick faces, and the condition of the existing flashing. We also check inside the loft, where the stack base, the surrounding felt or membrane, and any visible timbers can tell you whether water has already been getting in.
The inspection also covers the roof covering immediately around the stack - tiles or slates that have lifted, cracked or slipped in that area, since movement of the stack often damages them before any internal damp becomes obvious. All of this feeds into an accurate picture of what the job involves.
Safe access is not optional. Chimney take-downs require working at height, and the tiles immediately below the stack need protecting from falling debris. Before any bricks come down, we lay boards or use hessian catch sheets on the roof slope below the stack. This protects the existing tiles from impact and gives a stable surface to work from.
For a straightforward stack on a standard pitched roof, a scaffold tower or a pair of roof ladders is usually sufficient. For a larger stack, an offset stack, or where the ridge height and pitch make roof ladders impractical, a full scaffold lift may be needed. We tell you at the inspection stage what access arrangement is appropriate and factor it into the price - there should be no surprises on the day.
Any tools, equipment and rubble bags are organised at ground level before work starts. Bricks from the stack are not dropped - they are passed down, placed in bags, or lowered to keep the roof surface and the garden below safe.
The brickwork is removed course by course from the top of the stack downward. A cold chisel and lump hammer, or for larger jobs a small electric chipper, break the mortar joints so bricks can be removed cleanly. Working steadily and in sequence prevents the stack from becoming unstable partway through the process.
The target level for a partial take-down is just below the roof line - typically a single course of brickwork left on the stack base below the tile or slate surface, enough to provide a stable flat base but nothing projecting above the roof. Some homeowners want everything removed to the ceiling level of the room below, but this is a bigger structural project and is agreed separately at the survey stage.
As bricks are removed, they are set aside and either bagged for skip removal or, if they are in sound condition, set aside for the homeowner to keep or reuse. Old lime mortar brushes off reasonably well; cement mortar is harder to remove cleanly but the bricks can still often be reused in garden projects.
Once the brickwork is down to below roof level, the lead or mortar flashing around the old stack base is taken off. This involves carefully lifting the lead from the mortar joints it was dressed into. Old lead that is still in reasonable condition can sometimes be reused in another part of the roof. Lead that is cracked, thinned by thermal movement or has been patched multiple times is replaced.
Any tiles or slates that were butted up against or tucked under the flashing are carefully lifted at this stage. They need to come off cleanly because they will be relaid as part of the reinstatement, and damaged ones are replaced rather than put back.
With the stack gone, the rectangular gap in the roof needs to be framed and closed from below before any tiling can happen. New treated timber noggins are cut to span between the rafters on either side of the opening, creating a solid framework at the correct depth to support decking and underlay at the same level as the surrounding roof structure.
Exterior-grade OSB or plywood is then fixed across the framing. This decking is the base for everything above it - underlay, battens and tiles. It needs to be level with the surrounding sarking or decking so the finished tile surface sits flush. A poor job at this stage results in a visible ridge or dip in the repaired area.
New underlay is laid over the decking and lapped correctly into the existing underlay on either side. Where the existing underlay is old bitumen felt, the new material is overlapped over it and sealed at the edges. Where the existing material is a breathable membrane, the new patch is lapped in the same way.
Tiling battens are then fixed through the underlay into the decking and into the noggins below, at the correct gauge (spacing) to match the tile or slate being used. Getting the batten gauge right is essential - too wide and the tiles will not cover the course above correctly; too narrow and the exposure of each tile is reduced and the overall look is wrong.
New tiles or slates are fitted to match the existing roof covering as closely as possible. For plain clay tiles and natural slates, second-hand material sourced from salvage is often the best route to a good colour match. For concrete interlocking tiles, new tiles from the same manufacturer and product range are used where possible.
The courses are worked up from the bottom of the patched area, with each course overlapping the one below by the correct amount for that tile type. Ridge tiles, if disturbed, are rebedded. The top course of the patch meets the existing tiles or slates above, and any cut tiles needed to fill the edges are cut neatly to size.
Inside the loft, the remaining stack base or flue is capped. A solid cap with a small ventilation grille prevents both weather ingress and condensation building up in the sealed flue column. The timbers around the old stack base are checked for any signs of rot or damp damage that occurred before the take-down and treated or replaced if needed.
The fireplace opening inside the house, if still open, is left for the homeowner to deal with at their convenience - it does not need to be done on the same day as the roof work, but it should be capped and vented rather than sealed airtight.
All debris is cleared from the roof surface, gutters are checked and cleared of any brick dust or mortar that has washed in, and the surrounding area at ground level is tidied. We check the finished area from the ground with binoculars and, where accessible, from close range once more before taking down any access equipment.
We carry out chimney take-downs in Martlesham and across the surrounding area, including Ipswich, Woodbridge, Rushmere St Andrew, Nacton, Felixstowe, Stowmarket, Shotley and Brantham. Call us to arrange a proper roof-level inspection so we can give you an accurate picture of your stack's condition and a clear price for the work.